GBC VOYAGER 3 930-032 User Manual

Browse online or download User Manual for Laminators GBC VOYAGER 3 930-032. GBC VOYAGER 3 930-032 User's Manual

  • Download
  • Add to my manuals
  • Print
  • Page
    / 34
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 0
Voyager 3
OPERATION MANUAL
®
Part Number: 930-032 REV: A REV DATE: 04-02-04
©2004 GENERAL BINDING CORPORATION ALL RIGHTS RESERVED.
Do not duplicate without written permission.
Page view 0
1 2 3 4 5 6 ... 33 34

Summary of Contents

Page 1 - Voyager 3

Voyager 3OPERATION MANUAL®Part Number: 930-032 REV: A REV DATE: 04-02-04©2004 GENERAL BINDING CORPORATION ALL RIGHTS RESERVED.Do not duplicate with

Page 2

Operations Manual: SafetyVoyager 3Voyager 32004 General Binding CorporationPage 1-4Jog/Slow Speed w/Guard Open 1.3 Emergency stops (E-Stop)The Voyager

Page 3

Operations Manual: SafetyVoyager 3Voyager 32004 General Binding CorporationPage 1-51.5 PneumaticsThe pneumatic system used to provide upwardpressure o

Page 4

WARNING: DO NOT operate unless youhave been fully trained. DO NOT operateuntil you have read the OPERATINGINSTRUCTIONS completely.CAUTION Maximum Air

Page 5

Operations Manual: SafetyVoyager 3Voyager 32004 General Binding CorporationPage 1-7CAUTION HOT SURFACE/ PINCH POINT:Surface may be hot. Do not touch.

Page 6

WARNING: Sharp edge. Keeps hands andfingers away. Sharp edge can cut.WARNING: Keep hands and fingers away.The gate can crush.Operations Manual: Safety

Page 7

Operations Manual: SafetyVoyager 3Voyager 32004 General Binding CorporationPage 1-9!!!WARN INGACHTUNGMISE EN GARDECarefully read Operator'sManual

Page 8

Operations Manual: SafetyVoyager 3Voyager 32004 General Binding CorporationPage 1-101.8 Know your laminatorTo help you relate to the components referr

Page 9

Operations Manual: SafetyVoyager 3Voyager 32004 General Binding CorporationPage 1-11LaminatorSeparator

Page 10

Operations Manual: SafetyVoyager 3Voyager 32004 General Binding CorporationPage 1-12

Page 11

Operations Manual: WarrantyVoyager 3Voyager 32004 General Binding CorporationPage 2-12.0 Limited 90-Day WarrantyGBC warrants to the original purchaser

Page 13

Operations Manual: WarrantyVoyager 3Voyager 32004 General Binding CorporationPage 2-2

Page 14

Operations Manual: SpecificationsVoyager 3Voyager 32004 General Binding CorporationPage 3-13.0 Specifications3.1 MACHINE SPECIFICATIONMaximum Speed: 1

Page 15

Operations Manual: SpecificationsVoyager 3Voyager 32004 General Binding CorporationPage 3-2Ambient Air Temp: 5°-40° CHumidity Rating: 30%-95% (Non-Con

Page 16

Operations Manual: SpecificationsVoyager 3Voyager 32004 General Binding CorporationPage 3-3Other: Vacuum and blower adjustmentsConveyor:Type: Vacuum s

Page 17

Operations Manual: SpecificationsVoyager 3Voyager 32004 General Binding CorporationPage 3-4Motor power: 1.85 kW (informative)RPM at 50 Hz: 1420 (info

Page 18

4.0 InstallationCAUTION: The GBC Voyager 3 can only beinstalled by a trained GBC ServiceRepresentative.Before a Voayger 3 Laminator can be installed,

Page 19

Operations Manual: InstallationVoyager 3Voyager 32004 General Binding CorporationPage 4-2CAUTION:Do not locate the laminator whereair can blow directl

Page 20

Operations Manual: InstallationVoyager 3Voyager 32004 General Binding CorporationPage 4-3Figure 4.1.1 Suggested Floor LayoutMANUFACTURE OR FOR ANY OTH

Page 21

Operations Manual: InstallationVoyager 3Voyager 32004 General Binding CorporationPage 4-4Figure 4.1.2 ConnectionsMANUFACTURE OR FOR ANY OTHER PURPOSE

Page 22 - 4” (19 mm)

Operations Manual: InstallationVoyager 3Voyager 32004 General Binding CorporationPage 4-54.2 Receiving the cratesThe GBC Voyager 3 is shipped in two c

Page 23

Operations ManualVoyager 3Voyager 32004 General Binding CorporationITABLE OF CONTENTS1.0 Safety1.1 Explanation of symbols 1-11.2 General Rules of safe

Page 24

Operations Manual: InstallationVoyager 3Voyager 32004 General Binding CorporationPage 4-64.4 Positioning the componentsAll components are positioned b

Page 25

Operations Manual: InstallationVoyager 3Voyager 32004 General Binding CorporationPage 4-7FeederOnce the feeder has been safely removed from thecrate,

Page 26

Operations Manual: InstallationVoyager 3Voyager 32004 General Binding CorporationPage 4-8Figure 4.4.1 Component placementCAUTION: Position waterheater

Page 27

Operations Manual: InstallationVoyager 3Voyager 32004 General Binding CorporationPage 4-94.5 Safety ChecklistOnce installation is complete, perform th

Page 28

Operations Manual: InstallationVoyager 3Voyager 32004 General Binding CorporationPage 4-10

Page 29

2004 General Binding CorporationII

Page 30 - Stacker table

Operations ManualVoyager 3Voyager 32004 General Binding CorporationIIIThe information in this publication is provided for reference and is believed to

Page 31 - (122 cm)

2004 General Binding CorporationIV

Page 32

Operations Manual: SafetyVoyager 3Voyager 32004 General Binding CorporationPage 1-11.0 SafetyCAUTION: Do not attempt to operate yourVoyager 3 Laminato

Page 33

Operations Manual: SafetyVoyager 3Voyager 32004 General Binding CorporationPage 1-21.2 General rules of safetyELECTRICAL HAZARD: Do not operatethe lam

Page 34

Operations Manual: SafetyVoyager 3Voyager 32004 General Binding CorporationPage 1-3CAUTION: Vapor build up or stored flam-mable liquids can cause a fi

Comments to this Manuals

No comments